Union Square – Central Subway Blog http://www.centralsubwayblog.com/blog Connecting people. Connecting Communities. Wed, 20 Jul 2016 00:18:59 +0000 en-US hourly 1 https://wordpress.org/?v=4.4.4 Featured Photo – June 17 http://www.centralsubwayblog.com/blog/2016/06/featured-photo-june-17/ http://www.centralsubwayblog.com/blog/2016/06/featured-photo-june-17/#respond Fri, 17 Jun 2016 22:14:39 +0000 http://www.centralsubwayblog.com/blog/?p=7601 This week’s photos feature above and below ground images at the Union Square|Market Street Station. Here, a backhoe fitted with a jackhammer breaks up pieces of concrete during excavation of the station box.

160615_1050_UMS

 

Below, sparks fly as a worker uses an angle grinder to smooth edges of a steel bracket inside the north concourse, where temporary steel reinforcing is being installed.

160615_1075_UMS

 

An underground view of the southeast corner of the Union Square Garage where construction of the north station entrance is ongoing.

160615_1056_UMS

If you would like to see more photos of project construction, check out our Flickr, updated weekly!

]]>
http://www.centralsubwayblog.com/blog/2016/06/featured-photo-june-17/feed/ 0
Project Advancement |May 6 -16 http://www.centralsubwayblog.com/blog/2016/05/project-advancement-may-6-16/ http://www.centralsubwayblog.com/blog/2016/05/project-advancement-may-6-16/#respond Fri, 06 May 2016 23:59:02 +0000 http://www.centralsubwayblog.com/blog/?p=7544 Sections of pipe are stacked for installation on 4th Street north of Townsend

Sections of pipe are stacked for installation on 4th Street north of Townsend

This notice provides a construction update and a look ahead for what to expect in the areas where we are building four new stations along the alignment. You’ll find information about work activities, traffic and transportation impacts taking place over the next two weeks at SoMa, Yerba Buena|Moscone, Union Square and Chinatown.

Construction at the Yerba Buena|Moscone station continues. Construction of the mezzanine floor is progressing and crews are building concrete forms for the final section. Excavation continues in the headhouse. Workers are installing a water line at 4th Street and Howard.

Construction schedules, bus routes, and stop locations are subject to change due to unforeseen conditions. Signs will be posted at affected stops to advise of service changes.

Our thanks go out to the businesses, residents, shoppers, commuters, and all those who are touched by the Project, for their continued engagement as we work to extend the city’s public transportation system.

The Central Subway Team

]]>
http://www.centralsubwayblog.com/blog/2016/05/project-advancement-may-6-16/feed/ 0
Featured Photos – April 28 http://www.centralsubwayblog.com/blog/2016/04/featured-photos-april-28/ http://www.centralsubwayblog.com/blog/2016/04/featured-photos-april-28/#respond Thu, 28 Apr 2016 23:31:56 +0000 http://www.centralsubwayblog.com/blog/?p=7502 Construction is in full swing both above ground and below on Stockton between Maiden Lane and Ellis Street. In this photo, concrete for a new curb has been poured at the northeast corner of Stockton and Geary streets.

160426_1133_UMS

 

Waterproofing vinyl and a slab of concrete now cover a new section of roof deck on the north side of the O’Farrell and Stockton intersection.

160426_1197_UMS

 

Underground, workers drill inside the station box between Geary and O’Farrell streets.

160426_1257_UMS

If you would like to see more photos of project construction, check out our Flickr, updated weekly!

 

]]>
http://www.centralsubwayblog.com/blog/2016/04/featured-photos-april-28/feed/ 0
Featured Photos – April 8 http://www.centralsubwayblog.com/blog/2016/04/featured-photos-april-8/ http://www.centralsubwayblog.com/blog/2016/04/featured-photos-april-8/#respond Wed, 13 Apr 2016 22:25:54 +0000 http://www.centralsubwayblog.com/blog/?p=7432 An excavator operator dumps material removed from the station box at the access shaft south of Geary, on Stockton.

160405_1219_UMS

Construction workers supervise excavation activity under Stockton Street.

Two men observe excavation activity under Stockton, south of Geary.

A view from inside the southeast corner of the Union Square Garage, as workers demolish floors to prepare for construction of the north station entrance.

160405_1303_UMS

If you would like to see more photos of project construction, check out our Flickr, updated weekly!

 

 

]]>
http://www.centralsubwayblog.com/blog/2016/04/featured-photos-april-8/feed/ 0
Project Advancement | February 26 – March 7 http://www.centralsubwayblog.com/blog/2016/02/project-advancement-february-26-march-7-2/ http://www.centralsubwayblog.com/blog/2016/02/project-advancement-february-26-march-7-2/#comments Sat, 27 Feb 2016 00:52:47 +0000 http://www.centralsubwayblog.com/blog/?p=7285 Steel supports are installed for the roof deck of the station box on Stockton Street

Steel supports are installed for the roof deck of the station box on Stockton Street

This notice provides a construction update and a look ahead for what to expect in the areas where we are building four new stations along the alignment. You’ll find information about work activities, traffic and transportation impacts taking place over the next two weeks at SoMa, Yerba Buena|Moscone, Union Square and Chinatown.

Starting Monday night, February 29 through Monday, March 7, the contractor will be performing night work to pothole at the intersection of Stockton Street and Washington Street. Hours of construction are 10p.m. to 5a.m.

Construction schedules, bus routes, and stop locations are subject to change due to unforeseen conditions. Signs will be posted at affected stops to advise of service changes.

Our thanks go out to the businesses, residents, shoppers, commuters, and all those who are touched by the Project, for their continued engagement as we work to extend the city’s public transportation system.

]]>
http://www.centralsubwayblog.com/blog/2016/02/project-advancement-february-26-march-7-2/feed/ 2
Featured Photos – February 25 http://www.centralsubwayblog.com/blog/2016/02/featured-photos-february-25/ http://www.centralsubwayblog.com/blog/2016/02/featured-photos-february-25/#respond Thu, 25 Feb 2016 22:32:18 +0000 http://www.centralsubwayblog.com/blog/?p=7276 A temporary structure for rebuilding the roof of the south east corner of the Union Square Garage. This will be the future site of the north entrance to the Union Square|Market Street Station.

160223_1081_UMS

Demolition work at the south east corner of the Union Square Garage.

160223_1056_UMS

A view from inside the north concourse, north of Geary Street, where a small jackhammer is being used to smooth the walls during excavation.

160223_1157_UMS

If you would like to see more photos of project construction, check out our Flickr, updated weekly!

]]>
http://www.centralsubwayblog.com/blog/2016/02/featured-photos-february-25/feed/ 0
Featured Photos – December 3 http://www.centralsubwayblog.com/blog/2015/12/featured-photos-december-3/ http://www.centralsubwayblog.com/blog/2015/12/featured-photos-december-3/#respond Fri, 04 Dec 2015 00:32:49 +0000 http://www.centralsubwayblog.com/blog/?p=7133 Union Square Business Improvement District (BID) Executive Director Karin Flood and Central Subway Program Director John Funghi kick-off the second annual Winter Walk. This pop-up open space, features entertainment, Off the Grid food trucks, and is located on Stockton Street between Geary and Ellis during the holiday moratorium.

151202_1051_UMS

The much-appreciated plaza features a nightly light show that is projected onto the Macy’s Men’s building, featuring San Francisco landmarks and holiday themed-images.

151202_1028_UMS

Shoppers, pedestrians, visitors and locals of all ages can enjoy the open space, festive decorations and special seating in the plaza through the first of January.

151125_1042_UMS

If you would like to see more photos of project construction, check out our Flickr, updated weekly!

]]>
http://www.centralsubwayblog.com/blog/2015/12/featured-photos-december-3/feed/ 0
Celebrate the Holiday Season in the Winter Walk http://www.centralsubwayblog.com/blog/2015/11/celebrate-the-holiday-season-in-the-winter-walk/ http://www.centralsubwayblog.com/blog/2015/11/celebrate-the-holiday-season-in-the-winter-walk/#respond Wed, 25 Nov 2015 00:32:52 +0000 http://www.centralsubwayblog.com/blog/?p=7116 Slender metal stakes and a long strip of adhesive affixed to the underside of the turf joints keep everything together.

Slender metal stakes and a long strip of adhesive affixed to the underside of the turf joints keep everything together as workers set up for the 2015 Winter Walk

Happy Thanksgiving!  The Central Subway team wishes San Francisco a happy and healthy 2015 holiday season.

Come and celebrate the season with the second annual Union Square Winter Walk. Beginning Friday, November 27 and continuing through New Year’s Day, Stockton Street between Ellis and Geary will be transformed into a winter wonderland.

Last year, the Winter Walk was a great success and we have more holiday treats and surprises for the public this year. Off the Grid food trucks will be there to satisfy hungry shoppers.  A nightly light show will dazzle the Winter Walk.  Sample Ghirardelli chocolate on Saturdays. There will be performances by carolers and other entertainers.  These are just some of the delights available for your pleasure in the Winter Walk. For more information see #WinterWalkSF.

We hope to see you all at the Winter Walk.  Thanks to the entire public for your cooperation in 2015 as we build a new subway for our city.

Here are some photos from last year’s Winter Walk:

The Winter Walk is a great place for shoppers to relax after a busy day of shopping

The Winter Walk is a great place for shoppers to relax after a busy day of shopping

 

Shoppers enjoying the night in the 2014 Winter Walk

Shoppers enjoying  the 2014 Winter Walk

Off the Grid trucks were stationed in the Winter Walk 2014.   They are returning to provide treats to hungry shoppers

Off the Grid trucks were stationed in the Winter Walk 2014. They are returning this year to provide treats to hungry shoppers

]]>
http://www.centralsubwayblog.com/blog/2015/11/celebrate-the-holiday-season-in-the-winter-walk/feed/ 0
Featured Photos – October 22 http://www.centralsubwayblog.com/blog/2015/10/featured-photos-october-22/ http://www.centralsubwayblog.com/blog/2015/10/featured-photos-october-22/#respond Thu, 22 Oct 2015 22:27:37 +0000 http://www.centralsubwayblog.com/blog/?p=7063 Construction of the North Concourse at the future site of the Union Square/Market Street Station.

151014_1202_UMS

Crews build a new ramp inside the Union Square Garage located at the southeast corner of Union Square.

151014_1211_UMS

Work is taking place on all four levels of the garage.  This work includes laying rebar, constructing concrete forms and building a wall.

151014_1215_UMS

If you would like to see more photos of project construction, check out our Flickr, updated weekly!

]]>
http://www.centralsubwayblog.com/blog/2015/10/featured-photos-october-22/feed/ 0
Union Square | Market Street Station Update http://www.centralsubwayblog.com/blog/2015/09/union-square-market-street-station-update/ http://www.centralsubwayblog.com/blog/2015/09/union-square-market-street-station-update/#comments Thu, 17 Sep 2015 23:07:15 +0000 http://www.centralsubwayblog.com/blog/?p=6993 Rendering of theunderground Union Square | Market Street station.  This station will feature a concourse that will allow T Third passengers to easily access other Muni lines and BART

Rendering of the underground Union Square | Market Street station. This station will feature a concourse that will allow T Third passengers to easily access other Muni lines and BART

There is a lot of activity as construction moves forward in Union Square.  At the corner of Geary and Stockton, a small portion of the Union Square Garage is being demolished to allow for the construction of the north entrance to the Union Square. The entrance will open to the sidewalk of Geary and Stockton.

Construction on the roof of the north concourse is ongoing.  The work is being done in sections on Stockton near Maiden Lane and Geary.  Workers have excavated soil to the roof level, installed steel beams and corrugated steel sheets, and poured concrete.

Work on the south concourse to the Union Square | Market Street station is also underway.   At the intersection of Ellis and Stockton, crews are removing soil and reconstructing the currently closed Ellis Street entrance to Powell/BART/Muni station to also accommodate the Union Square | Market Street Station.

Throughout the construction area, drilling and compensation grouting are being performed.  In compensation grouting, a concrete-like solution is injected under pressure into a pre-drilled hole.  This helps to harden and stabilize the soil under surrounding buildings and structures.

All of the work has a great benefit.  Not only will the Union Square | Market Street Station give residents and tourists easy access to Union Square, it will also have a walk way connecting passengers easily to other Muni lines and BART.

Here are some photos of the construction:

A worker adds a section of drill shaft during compensation grouting operations south of Geary.

A worker adds a section of drill shaft during compensation grouting operations south of Geary

 

Looking south down the future south concourse, with the access shaft north of Ellis in the foreground.

Looking south down the future south concourse, with the access shaft north of Ellis in the foreground

 

Structural walls are being constructed inside the south concourse of the Union Square/Market Street Station.

Structural walls are being constructed inside the south concourse of the Union Square/Market Street Station

]]>
http://www.centralsubwayblog.com/blog/2015/09/union-square-market-street-station-update/feed/ 1