26 March 2015 ~ 0 Comments

Featured Photos – March 25

A decorative set-back curb and wall located above the Central Subway tunnel entrance south of Harrison on 4th Street.

150319_1013_TunnelPortal

View of the tunnel portal ramp from 4th and Stillman during construction of the portal walls, which will separate automobile traffic from light rail vehicles.

150304_1151_TunnelPortal

Workers put up temporary bracing while they pour concrete for the tunnel portal walls at 4th and Perry Alley.

150311_1120_TunnelPortal

Be Sociable, Share!

Leave a Reply